Changes

Jump to navigation Jump to search

Mine door (silver)

8 bytes removed, 10:16, 16 February 2020
no edit summary
Each improvement uses 0.1 kg of the silver lump and raises the strength of the mine door by a fifth of the difference between current strength and maximum strength.
The following graph shows the decay of a silver mine door on deed over the course of over a year. The Mine door has been repaired a few times since.
The decay has been about 28 strength per day on average over the whole period of 400 days.
editor
71

edits

Navigation menu