FlatRaising is a term used to describe the way to get slopes greater than 40 dirt (4 meters).
===Why it It is usedUsed===
It is used because dirt "flows" when a slope gets to 40 (4 meters), what i mean by "Flow" is that the dirt will slide down the slope until it gets to a lesser slope.
How to tell what a slope is.. Well examine Examine the Tile tile border, but ; dirt will also flow if the diagonal of the tile is over 4 meter slope as well.
===Restrictions===
===Notes===
Another option is to dig at the base of a slope to increase it, but this is not always possible (e.g. on landbridges land bridges or when doing a road along rock).
===Tips===