Changes

Jump to navigation Jump to search

Paving

271 bytes added, 02:02, 17 June 2013
| 40 || [[Marble slab floor]]
|}
 
In addition, a certain level of paving is required to build these kinds of floor at a given height. For example, 50 paving is enough for the sixth floor (counting the ground floor as first floor), but not the seventh, in either Marble or Stone Slab (others not tested).
==See also==
18

edits

Navigation menu