Difference between revisions of "Clad"
(Page created) |
|||
Line 3: | Line 3: | ||
==Description== | ==Description== | ||
Clad is the terminology given to the process of applying materials to an existing reinforced mine wall. This is used in a decorative or aesthetic purpose, and has no further [[Support beam|reinforcement]] effect on the tile it is applied to. | Clad is the terminology given to the process of applying materials to an existing reinforced mine wall. This is used in a decorative or aesthetic purpose, and has no further [[Support beam|reinforcement]] effect on the tile it is applied to. | ||
− | |||
− | |||
− | |||
− | |||
==Items required== | ==Items required== |
Revision as of 02:14, 14 August 2017
Contents
Description
Clad is the terminology given to the process of applying materials to an existing reinforced mine wall. This is used in a decorative or aesthetic purpose, and has no further reinforcement effect on the tile it is applied to.
Items required
Method
Packing dirt is the first paving action required to add any type of pavement. Paving is then added to this packed dirt, except for floor boards, which may be laid on dirt or marsh. Activate the item you want to pave with then right-click the tile and choose Pave.
Higher paving skill and higher quality paving items give a faster completion timer.
Removing paving
Paved tiles may be cultivated back to dirt by equipping a shovel and choosing 'Destroy pavement'. Body strength of 20 and a digging skill of 10 is required for destroying pavement. Destroying pavement gives digging skill and the length of time it takes to remove the pavement is also based on this digging.
Diagonal paving
Selecting "Pave nearest corner" will pave half of the tile diagonally depending on the paving type being laid.
Subterranean paving
Paving underground(in mines) can be done by first reinforcing the mine floor. After the tile is supported, you can apply mortar to the reinforcement. Once the tile is prepared, you're able to perform normal above-ground paving methods(all above options are available underground as well).
It should be noted that paving diagonally is not possible whilst underground.
Bridge paving
Paving the surface of a completed bridge can be done similarly to subterranean paving. After the bridge is completed, you must apply mortar to the bridge's surface. After the roadway is prepared, you can then apply the paving type of your choosing.
House floors
Paving is also used to build house floor plans. The minimum skill requirements are:
Skill | Floor |
---|---|
21 | Stone brick floor, Stone slab floor, Sandstone slab floor |
25 | Pottery brick floor |
30 | Slate slab floor |
40 | Marble slab floor |
In addition, a certain level of paving is required to build these kinds of floor at a given height. The skill required is the same as listed on the table for Multi-story housing for the same floors... so 70 skill for 8th floor etc.
See also
Titles
- Roadbuilder at 50 skill
- Road Engineer at 70 skill
- Road Warrior at 90 skill