Difference between revisions of "Support beam"
Jump to navigation
Jump to search
m |
m |
||
Line 5: | Line 5: | ||
=== Method === | === Method === | ||
− | # Activate a [[shaft]] and right-click the [[log]], select Create>Miscellaneous>''{{PAGENAME}}''' | + | # Activate a [[shaft]] and right-click the [[log]], select Create>Miscellaneous>'''{{PAGENAME}}''' |
# Activate a [[shaft]] and right-click the unfinished [[support beam]], select Continue. Repeat x3. | # Activate a [[shaft]] and right-click the unfinished [[support beam]], select Continue. Repeat x3. | ||
# Activate a [[iron ribbon]] and right-click the unfinished [[support beam]], select Continue. Repeat. | # Activate a [[iron ribbon]] and right-click the unfinished [[support beam]], select Continue. Repeat. | ||
Line 17: | Line 17: | ||
== Resulting Product == | == Resulting Product == | ||
:* Unfinished support beam | :* Unfinished support beam | ||
− | :* ''{{PAGENAME}}''' - 60.0kg | + | :* '''{{PAGENAME}}''' - 60.0kg |
== Usage == | == Usage == |
Revision as of 10:22, 12 January 2007
Main / Skills / Carpentry / Support beam
Description
A wooden construction made from logs, shafts and iron ribbons intended to support walls in mines.
Method
- Activate a shaft and right-click the log, select Create>Miscellaneous>Support beam
- Activate a shaft and right-click the unfinished support beam, select Continue. Repeat x3.
- Activate a iron ribbon and right-click the unfinished support beam, select Continue. Repeat.
- Activate a log and right-click the unfinished support beam, select Continue.
Items Required
- 4 Shaft - 1.0kg
- 2 Iron ribbon
- 2 Log - 25.0kg
Resulting Product
- Unfinished support beam
- Support beam - 60.0kg
Usage
- Activate a support beam and right-click the cave wall, select "Reinforce Wall".
Notes
You need to attach a support beam to every wall of a cave tile to prevent the tile from collapsing. You cannot mine a reinforced tile, but it will help to prevent cave collapse.
Hint: If you are making the support beams outside of the mine, your best approach is to leave it unfinished (e.g. requiring a shaft or a ribbon) and place them in a cart as more unfinished support beams fit in a cart than finished ones.