Difference between revisions of "Maximum slope"
Jump to navigation
Jump to search
(cleanup, mine entrance note) |
|||
Line 1: | Line 1: | ||
[[CDB|Main]] / [[:Category:Misc|Misc]] / '''{{PAGENAME}}''' | [[CDB|Main]] / [[:Category:Misc|Misc]] / '''{{PAGENAME}}''' | ||
− | + | To calculate the maximum slope you can build a [[fence]], [[stone wall]], or [[tall stone wall]] on, based on your [[carpentry]] or [[masonry]] [[skill]], use the following formula (submitted by ketza): | |
− | To calculate the maximum slope you can build a [[fence]], [[stone wall]] or [[tall stone wall]] on, based on your [[carpentry]] or [[masonry]] skill, use the following formula (submitted by ketza): | ||
− | |||
''Max slope = (3 *'' √''skill) + 10'' | ''Max slope = (3 *'' √''skill) + 10'' | ||
Line 10: | Line 8: | ||
'''Note:''' The answer is rounded ''down''. | '''Note:''' The answer is rounded ''down''. | ||
− | |||
Alternatively, to find the skill required for a given slope, use this formula: | Alternatively, to find the skill required for a given slope, use this formula: | ||
Line 18: | Line 15: | ||
This answer gets rounded ''up'' instead. | This answer gets rounded ''up'' instead. | ||
− | + | {| border=1 cellspacing=0 | |
− | + | !Skill !! Maximum Slope !! !!Skill !!Maximum Slope !! !!Skill !!Maximum Slope | |
− | {| border= | ||
− | !Skill !! Maximum Slope !! | ||
|- | |- | ||
|1 || 13|| || 16 || 22 || || 49 || 31 | |1 || 13|| || 16 || 22 || || 49 || 31 | ||
Line 42: | Line 37: | ||
|} | |} | ||
− | [[Category:Misc]][[Category:Babel/M]] | + | '''Note:''' tile border fence building limitations around [[mine]]s/caves/tunnels are not affected by maximum slope. |
+ | |||
+ | [[Category:Misc]] | ||
+ | [[Category:Babel/M]] |
Revision as of 20:40, 20 October 2007
To calculate the maximum slope you can build a fence, stone wall, or tall stone wall on, based on your carpentry or masonry skill, use the following formula (submitted by ketza):
Max slope = (3 * √skill) + 10
(3 times the square root of your skill, then add 10)
Note: The answer is rounded down.
Alternatively, to find the skill required for a given slope, use this formula:
Skill = (slope - 10)^2 / 9
This answer gets rounded up instead.
Skill | Maximum Slope | Skill | Maximum Slope | Skill | Maximum Slope | ||
---|---|---|---|---|---|---|---|
1 | 13 | 16 | 22 | 49 | 31 | ||
2 | 14 | 19 | 23 | 54 | 32 | ||
3 | 15 | 22 | 24 | 59 | 33 | ||
4 | 16 | 25 | 25 | 64 | 34 | ||
6 | 17 | 29 | 26 | 70 | 35 | ||
8 | 18 | 33 | 27 | 76 | 36 | ||
9 | 19 | 36 | 28 | 81 | 37 | ||
12 | 20 | 41 | 29 | 88 | 38 | ||
14 | 21 | 45 | 30 | 94 | 39 |
Note: tile border fence building limitations around mines/caves/tunnels are not affected by maximum slope.