Difference between revisions of "Masonry house"
Jump to navigation
Jump to search
m (creating wall plans covered in seperate article) |
m (edited to bring the article more in line with the Wooden house article) |
||
Line 6: | Line 6: | ||
== Method == | == Method == | ||
=== Building === | === Building === | ||
− | + | # Create a [[building plan]] for your future structure. | |
− | + | # Activate a [[trowel]], right-click the wall plan, and select your desired wall type. | |
− | + | # With the trowel activated, right-click the wall plan, and select ''Continue building'' until the [[wall]], [[window]], or [[sturdy door]] is finished. | |
* You have to have at least one stone brick and one mortar in your inventory to start a wall or continue building it. A wall needs 20 actions to finish, each action consuming one mortar and one stone brick. | * You have to have at least one stone brick and one mortar in your inventory to start a wall or continue building it. A wall needs 20 actions to finish, each action consuming one mortar and one stone brick. | ||
+ | * '''The stone brick and mortar will be consumed shortly after you start the action, do not move while building or the action is aborted and the resources are lost'''. | ||
+ | * A building plan with no walls will decay in a few days, make sure you start at least one wall. | ||
=== Tools required === | === Tools required === | ||
Line 20: | Line 22: | ||
=== Improving === | === Improving === | ||
− | * You must repair any damage on the walls with a [[stone brick]] before improving it. | + | * You must [[repairing|repair]] any [[damage]] on the walls with a [[stone brick]] before [[improve|improving]] it. |
− | * Activate | + | * Activate a stone brick, right-click the wall and select ''Repair'' or ''Improve''. |
− | * The effective quality of the stone brick is affected by its | + | * The effective [[quality]] of the stone brick is affected by its damage and your [[masonry]] skill, it must be higher than the wall's current quality. |
=== Skills used === | === Skills used === |
Revision as of 09:41, 3 June 2009
Main / Masonry / Masonry house
Contents
Description
A stone house is stronger than a regular wooden house. A stone house takes more skills and resources to build, but offers more protection from decay, theft, and invaders.
Method
Building
- Create a building plan for your future structure.
- Activate a trowel, right-click the wall plan, and select your desired wall type.
- With the trowel activated, right-click the wall plan, and select Continue building until the wall, window, or sturdy door is finished.
- You have to have at least one stone brick and one mortar in your inventory to start a wall or continue building it. A wall needs 20 actions to finish, each action consuming one mortar and one stone brick.
- The stone brick and mortar will be consumed shortly after you start the action, do not move while building or the action is aborted and the resources are lost.
- A building plan with no walls will decay in a few days, make sure you start at least one wall.
Tools required
Items required
- 20x mortar per wall
- 20x stone brick per wall
Improving
- You must repair any damage on the walls with a stone brick before improving it.
- Activate a stone brick, right-click the wall and select Repair or Improve.
- The effective quality of the stone brick is affected by its damage and your masonry skill, it must be higher than the wall's current quality.
Skills used
At least 30 skill in masonry is required in order to build a stone house, a player with less than 30 skill in masonry can not start or continue building a stone house.