Difference between revisions of "Lore:Cave Canal"
m |
|||
Line 1: | Line 1: | ||
− | The ''Cave Canal'', connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid | + | The ''Cave Canal'', connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid July and ending in late August, 673 tiles needed to be mined out, as well as surface rock sculpted, entry houses made, walls reinforced, mineral veins removed and the canal made deeper and with a higher roof. |
===Contributors=== | ===Contributors=== | ||
Line 12: | Line 12: | ||
*Stage three (Support Beams on the sides.): 30/07/09 - Ongoing | *Stage three (Support Beams on the sides.): 30/07/09 - Ongoing | ||
*Stage four (Docks and external features.): In planning phase - Ongoing | *Stage four (Docks and external features.): In planning phase - Ongoing | ||
+ | |||
+ | http://i564.photobucket.com/albums/ss87/Onklet/cavecanalcogcropped.png |
Revision as of 12:37, 5 September 2009
The Cave Canal, connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid July and ending in late August, 673 tiles needed to be mined out, as well as surface rock sculpted, entry houses made, walls reinforced, mineral veins removed and the canal made deeper and with a higher roof.
Contributors
In no particular order: Mystecore, ILerndGramrGud, Cameron, Wordsworth, Horothewise, Andreea, Llurendt, Robfox, Candymountai, Dreww, Artashes, Yazl, Ripsipiiraka, Pentaxpilot, Caesar, Tritus, Aureate, Gaffeek, Silentnight, Ulfpain, Tukster, Mithika, Ols, Nsu, Tigar, Aloof, Rabid
Some may have been missed out, contact Ols if you feel cheated.
Completion Dates
- Stage one (All tiles mined out.): 14/07/09 - 5/08/09 (Mineral veins taken down on 29/08/09)
- Stage two (Deepen the canal and raise the roof.): 22/07/09 - 29/08/09
- Stage three (Support Beams on the sides.): 30/07/09 - Ongoing
- Stage four (Docks and external features.): In planning phase - Ongoing