Difference between revisions of "Stone slab opening"
Jump to navigation
Jump to search
(Placeholder) |
(No difference)
|
Revision as of 11:11, 31 December 2012
Main / Skills / Masonry / Stone slab opening
This article is a stub. You can help by adding to it.
Stubs are articles that writers have begun work on, but are not yet complete enough to be considered finished articles. |
[[Image: |center|120x120px|A Stone slab opening]] |
Creation |
---|
|
Additional materials |
Result |
|
Skill and improvement |
|
Description
Floor plan to create an opening with a ladder for multi-story buildings.
Usage
- Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
- Right click the floor plan, select Build > Stone slab opening
Notes
- 21 paving skill is required to start a stone slab opening.
- TBC
Total materials needed
- TBC