Difference between revisions of "Marble slab opening"
Jump to navigation
Jump to search
(Placeholder) |
|||
Line 5: | Line 5: | ||
{{Item | {{Item | ||
|name=Marble slab opening | |name=Marble slab opening | ||
− | |image= | + | |image=marble opening.jpg |
|active= | |active= | ||
|passive=[[floor plan]] | |passive=[[floor plan]] |
Revision as of 08:38, 1 January 2013
Main / Skills / Masonry / Marble slab opening
This article is a stub. You can help by adding to it.
Stubs are articles that writers have begun work on, but are not yet complete enough to be considered finished articles. |
Creation |
---|
|
Additional materials |
Result |
|
Skill and improvement |
|
Description
Floor plan to create an opening with a ladder for multi-story buildings.
Usage
- Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
- Right click the floor plan, select Build > Marble slab opening
Notes
- 40 paving skill is required to start a marble slab opening.
Total materials needed
- TBC