Difference between revisions of "Stone Fence"
Jump to navigation
Jump to search
(No difference)
|
Revision as of 16:08, 19 June 2013
Main / Skills / Masonry / Stone Fence
[[Image: |center|120x120px|A Stone Fence]] |
Creation |
---|
|
Additional materials |
|
Result |
|
Skill and improvement |
|
Notes |
|
Description
A stone fence
Repair
Stone fences can be improved or repaired with stone brick.
Skill required
To start planning minimum of 5 Masonry skill required, even for totally flat tiles. *as of 12/22/12 (or some time before)
To calculate the maximum slope you can build on, based on your masonry skill, use the following formula (submitted by ketza):
Max slope = (3 * √skill) + 10
Note: The solution is rounded down.
Skill | Maximum Slope | Skill | Maximum Slope | Skill | Maximum Slope |
---|---|---|---|---|---|
1 | 13 | 16 | 22 | 49 | 31 |
2 | 14 | 19 | 23 | 54 | 32 |
3 | 15 | 22 | 24 | 59 | 33 |
4 | 16 | 25 | 25 | 64 | 34 |
6 | 17 | 29 | 26 | 70 | 35 |
8 | 18 | 33 | 27 | 76 | 36 |
9 | 19 | 36 | 28 | 81 | 37 |
12 | 20 | 41 | 29 | 88 | 38 |
14 | 21 | 45 | 30 | 94 | 39 |