Difference between revisions of "Thatched roof"

From Wurmpedia
Jump to navigation Jump to search
Line 22: Line 22:
 
* You need to have one thatch and one wire in inventory to start building the roof.
 
* You need to have one thatch and one wire in inventory to start building the roof.
 
* Can be repaired and improved with planks.  
 
* Can be repaired and improved with planks.  
 +
 +
 +
{| width="40%"
 +
! style="width: 33%;"|
 +
! style="width: 33%;"|
 +
! style="width: 33%;"|
 +
|-
 +
| style="padding: 5px;"|
 +
 +
{| class="wikitable" align=left
 +
!Floors  !! [[Thatching]]
 +
|-
 +
|| 2 || 21
 +
|-
 +
|| 3 || 25
 +
|-
 +
|| 4 || 30
 +
|-
 +
|| 5 || ?
 +
|-
 +
|| 6 || ?
 +
|-
 +
|}
 +
 +
| style="padding: 5px;"|
 +
 +
{| class="wikitable" align=center
 +
!Floors  !! [[Thatching]]
 +
|-
 +
|| 7  || ?   
 +
|-
 +
|| 8  || ?
 +
|-
 +
|| 9  || ?
 +
|-
 +
|| 10 || ?
 +
|-
 +
|| 11 || ?
 +
|-
 +
|}
 +
 +
| style="padding: 5px;"|
 +
 +
{| class="wikitable"
 +
!Floors  !! [[Thatching]]
 +
|-
 +
|| 12 ||  ?
 +
|-
 +
|| 13 ||  ?
 +
|-
 +
|| 14 ||  ?
 +
|-
 +
|| 15 ||  ?
 +
|-
 +
|| 16 ||  ?
 +
|}
 +
 +
|}
 +
 +
  
 
Picture until uploaded - http://i418.photobucket.com/albums/pp262/Leafgreens/wurm201212140223_2.jpg
 
Picture until uploaded - http://i418.photobucket.com/albums/pp262/Leafgreens/wurm201212140223_2.jpg

Revision as of 20:44, 27 April 2014

Main / Skills / Thatching / Thatched roof Template:Roof

Description

Roof plan to create thatched roofs for your buildings.

Usage

  • Right click the floor of the house, select Roof
  • Right click the roof plan, select Build and Thatched roof

Notes

  • Requires 21 thatching skill to build.
  • Building a roof above the fourth floor requires 30 Thatching.
  • You need to have one thatch and one wire in inventory to start building the roof.
  • Can be repaired and improved with planks.


Floors Thatching
2 21
3 25
4 30
5 ?
6 ?
Floors Thatching
7 ?
8 ?
9 ?
10 ?
11 ?
Floors Thatching
12 ?
13 ?
14 ?
15 ?
16 ?


Picture until uploaded - wurm201212140223_2.jpg

Total materials needed

  • 10x thatch
  • 10x wires (0.40kg)

Examine description: You see a roof under construction. The roof requires x bunches of thatch and x metal wires to be finished.