Difference between revisions of "Wood bridge - abutment"
Jump to navigation
Jump to search
m (Changed babel to W per Wurmpedia Team) |
m (Removed new tag) |
||
Line 1: | Line 1: | ||
− | |||
− | |||
{{BridgeSection | {{BridgeSection | ||
|name=Wood Bridge - Abutment | |name=Wood Bridge - Abutment |
Revision as of 11:44, 23 November 2015
Main Stage |
---|
Roadway Stage |
|
Wall Stage (each wall) |
|
Result |
|
Skill and improvement |
|
Description
"You see plans for a Wood abutment. The Wood abutment requires 4 large nails, 2 small nails, 8 wooden beams, 4 shafts, 24 planks and 4 iron ribbons to be finished."
Total Materials:
- 2 small nails
- 4 large nails
- 4 iron ribbons
- 4 shafts
- 8 wooden beams
- 24 planks