Difference between revisions of "Bridges"

From Wurmpedia
Jump to navigation Jump to search
m (Swapped old, limited bridge pane pic with new one that shows all options)
m (Redirected page to Bridge)
Tag: New redirect
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
A bridge allows for the connection of two land-masses, or even between a house and land or even house to house. A bridge, once complete, will act like any standard terrain, allowing for the crossing of animals, players and land vehicles. A bridge can also be made inside caves and can also be paved (Excluding [[Rope bridge|rope bridges]] and [[Wood bridge|wooden bridges]]) To prepare the bridge tile for paving, use a trowel and 1 [[mortar]] per tile, then pave.
+
#redirect[[Bridge]]
 
 
== Survey ==
 
 
 
Survey will give you information on where the other character is standing regarding distance, direction and height difference.
 
 
 
To survey for a bridge two characters are needed. One character must carry a [[range pole]], the other a [[dioptra]]. The lowest quality of the two items determines how long a bridge is that you can survey.'
 
 
 
The character with the range pole does not have to do much besides holding the range pole. To do this activate the range pole, click the ground and select ''Hold'' from the menu. When the action timer starts face the character with the dioptra.
 
 
 
The character with the dioptra will do the actual survey. Activate the dioptra, right click the player holding the range pole and select ''Survey'' from the menu.
 
 
 
The planning process will print messages in the event log
 
 
 
You carefully place the dioptra on its tripod in front of you.
 
You make sure the dioptra is level.
 
You point the dioptra at <other player>.
 
You line up the dioptra with <other player>.
 
You read the graduations on the range pole and work out the height difference.
 
<other player> is <x> tiles <direction> of you. Also you appear to be <x> dirt higher than <other player>.
 
You stop surveying.
 
You pack up the dioptra.
 
 
 
== Building ==
 
 
 
To plan a bridge two characters are needed. One character must carry a [[range pole]], the other a [[dioptra]].
 
 
 
The character with the range pole does not have to do much besides holding the range pole. To do this activate the range pole, click the ground and select ''Hold'' from the menu. When the action timer starts face the character with the dioptra.
 
 
 
The character with the dioptra will do the actuall bridge planning. Activate the dioptra, right click the player holding the range pole and select ''Plan bridge'' from the menu. Standing right in front of the other character will create a 1 tile wide bridge. Standing at an offset will create bridges multiple tiles wide.
 
 
 
The planning process will print messages in the event log
 
 
 
You carefully place the dioptra on its tripod in front of you.
 
looks like bridge would be <'width'x'length'> (East-West)
 
The tile border to your <direction> is level
 
You make sure the dioptra is level.
 
You point the dioptra at <other player>.
 
You wave at <other player>.
 
You line up the dioptra with <other player>.
 
You read the graduations on the range pole and work out the height difference.
 
The tile border to your helpers <direction> is level
 
You check the heights of the plan ends.
 
<Height difference>.
 
You work out the orientation and width for the bridge.
 
You check for clearance between the bridge ends.
 
You check for protruding foliage.
 
You check for nearby cave entrances and any lava.
 
You check for any items in the way.
 
You check that you have permissions to build the bridge.
 
You check for any bridges that may interfere with this bridge.
 
You check there would be no buildings under this bridge.
 
You work out the styles of bridges that would fit.
 
You start working out the bridge components required.
 
Planned bridge area is <x> tiles long and <y> tile wide.
 
(23:ESabFFFFFFFFFFFFFFFBASE)
 
You stop surveying.
 
You pack up the dioptra.
 
 
 
When all requirements are met you are presented with list of possible bridges.
 
 
 
[[Image:bridgepane.jpg]]
 
 
 
The selection depends on planned width, length, height difference and clearance below the planned bridge.
 
 
 
If you have choosen a flat bridge that is longer than 5 tiles then you have the possibility to change the schematic of your bridge plan.
 
 
 
When you have choosen a type of bridge you can name the planned bridge and select the steepness of the bridge if you've choosen an arched bridge.
 
 
 
[[Image:Bridge_Name_Steepness.png]]
 
 
 
After clicking ''Finalize'' a wooden frame for the bridge is constructed.
 
 
 
For each tile of the bridge a bridge segment has to be completed in multiple stages. Those are 'abutments' for the out segments, 'bracing' and 'floating' for stone bridges and 'crown' for rope and wood bridges.
 
 
 
Until the bridge has been completed no other bridge can be started by the character.
 
 
 
'''It is also important to note that, with bridge permissions set accordingly, players other than the original planners of the bridge may work on and complete said bridge.'''
 
 
 
== Bridge Warnings and Possible Solutions ==
 
'''Your end of the bridge is too close to the water level!'''
 
*Both ends of the bridge need to be at water level or higher.
 
 
 
 
 
'''"The quality of the [[dioptra]] makes it too hard to work out the distance." or "You can't read the graduations on the [[range pole]] at this distance".'''
 
*Improve both items. Note that the lowest QL of the two will determine the max length of bridge you can plan.
 
 
 
 
 
'''You notice that there is not enough clearance for a bridge to be built here.'''
 
*Remove trees, houses, fences at both end tiles where the bridge should have enough drop off.
 
*For bridges from a building, all walls under the bridge must be a solid wall type. Arched, windowed, and doors will not provide enough support.
 
 
 
 
 
'''There are some terrains nearby'''
 
*A cave entrance is one factor. Make sure to build the bridge at least 2 tiles away from the opening.
 
 
 
 
 
'''The (East) tile border in front of you must be level.'''
 
*Level the tile borders where the bridge will connect.
 
 
 
 
 
'''Some terrain is in the way!'''
 
*Possible solution: lower any tiles that height-wise are near the span of the bridge.
 
 
 
 
 
'''You notice that the west bridge end does not butt all to same building all way along.'''
 
*Possible solution: In the diagram below try standing on the letter '''B''' for both planners.
 
 
 
  +-----+-----+-----+
 
  |A  B|    |    |
 
  |  North Building |
 
  |C  D|    |    |
 
  +-----+-----+-----+
 
W |    |    |    | E
 
e |    |    |    | a
 
s |    |    |    | s
 
t +-----+-----+-----+ t
 
  |    |    |D  C|
 
  |  South Building |
 
  |    |    |B  A|
 
  +-----+-----+-----+
 
 
 
== Height difference ==
 
Arched bridges have a limit on the maximum height difference between the start and end point, which is between 10 and 11.43 per tile.
 
{|class="wikitable" style="text-align:center;"
 
! Distance !! Start elevation !! Max elevation !! Difference !! Difference per tile
 
|-
 
|4 || 375 || 415 || 40 || 10
 
|-
 
|5 || 375 || 432 || 57 || 11.4
 
|-
 
|6 || 375 || 440 || 65 || 10.83
 
|-
 
|7 || 375 || 455 || 80 || 11.43
 
|-
 
|8 || 375 || 465 || 90 || 11.25
 
|}
 
 
 
== Skill Requirements ==
 
 
 
Here is a table of the estimated required skill to plan bridges (by length and material). The person holding the dioptra requires this skill. These numbers are rough, whole-number estimates. '''You may require slightly more skill in practice.'''
 
{| class="wikitable"
 
|+Required skill by length (tiles) and material
 
|-
 
!Type/Length
 
!5 tiles
 
!6
 
!7
 
!8
 
!9
 
!10
 
!11
 
!12
 
!13
 
!14
 
!15
 
!16
 
!17
 
!18
 
!19
 
!20
 
!21
 
!22
 
!23
 
!24
 
!25
 
!26
 
!27
 
!28
 
!29
 
!30
 
!31
 
!32
 
!33
 
!34
 
!35
 
!36
 
!37
 
!38
 
!Skill used
 
|-
 
!Wood
 
|10
 
|23
 
|29
 
|34
 
|38
 
|41
 
|44
 
|47
 
|50
 
|52
 
|55
 
|57
 
|59
 
|62
 
|64
 
|66
 
|68
 
|70
 
|72
 
|74
 
|76
 
|77
 
|79
 
|81
 
|83
 
|85
 
|86
 
|88
 
|90
 
|92
 
|93
 
|95
 
|97
 
|99
 
|Carpentry
 
|-
 
!Rope
 
|10
 
|23
 
|29
 
|34
 
|38
 
|41
 
|44
 
|47
 
|50
 
|52
 
|55
 
|57
 
|59
 
|62
 
|64
 
|66
 
|68
 
|70
 
|72
 
|74
 
|76
 
|77
 
|79
 
|81
 
|83
 
|85
 
|86
 
|88
 
|90
 
|92
 
|93
 
|95
 
|97
 
|99
 
|Ropemaking
 
|-
 
!Brick
 
|30
 
|40
 
|45
 
|48
 
|51
 
|54
 
|56
 
|59
 
|61
 
|63
 
|65
 
|66
 
|68
 
|70
 
|72
 
|73
 
|75
 
|76
 
|78
 
|79
 
|81
 
|82
 
|84
 
|85
 
|86
 
|88
 
|89
 
|90
 
|92
 
|93
 
|95
 
|96
 
|97
 
|99
 
|Masonry
 
|-
 
!Marble/Slate/Sandstone
 
|40
 
|49
 
|53
 
|56
 
|58
 
|60
 
|63
 
|64
 
|66
 
|68
 
|70
 
|71
 
|73
 
|74
 
|75
 
|77
 
|78
 
|79
 
|81
 
|82
 
|83
 
|85
 
|86
 
|87
 
|88
 
|89
 
|90
 
|92
 
|93
 
|94
 
|95
 
|96
 
|97
 
|99
 
|Masonry
 
|-
 
!Arched Brick
 
|50
 
|57
 
|60
 
|63
 
|65
 
|67
 
|69
 
|70
 
|72
 
|73
 
|74
 
|76
 
|77
 
|78
 
|79
 
|81
 
|82
 
|83
 
|84
 
|85
 
|86
 
|87
 
|88
 
|89
 
|90
 
|91
 
|92
 
|93
 
|94
 
|95
 
|96
 
|97
 
|98
 
|99
 
|Masonry
 
|-
 
!Arched Marble/Slate/Sandstone
 
|60
 
|66
 
|68
 
|70
 
|72
 
|73
 
|75
 
|76
 
|77
 
|78
 
|79
 
|80
 
|81
 
|82
 
|83
 
|84
 
|85
 
|86
 
|87
 
|88
 
|88
 
|89
 
|90
 
|91
 
|92
 
|92
 
|93
 
|94
 
|95
 
|95
 
|96
 
|97
 
|98
 
|99
 
|Masonry
 
|-
 
|}
 
 
 
Note to build any bridge section, the skill requirement is:
 
 
 
{| class="wikitable"
 
|+Required skill by material
 
|-
 
!Type
 
!colspan="2"|Skill
 
|-
 
|Wood
 
|10
 
|Carpentry
 
|-
 
|Rope
 
|10
 
|Ropemaking
 
|-
 
|Brick
 
|30
 
|Masonry
 
|-
 
|Marble/Slate/Sandstone/Rounded Stone
 
|40
 
|Masonry
 
|-
 
|Arched Brick
 
|30
 
|Masonry
 
|-
 
|Arched Marble/Slate/Sandstone
 
|40
 
|Masonry
 
|}
 
 
 
When making the Rope Bridge, how much they sag is based on your character strength with options ranging from 3% to 12% sag.
 
{| class="wikitable"
 
|+Rope Bridge sag (3%-12%)
 
!Body Strength||Sag %
 
|-
 
|1||12
 
|-
 
|10||11
 
|-
 
|20||10
 
|-
 
|30||9
 
|-
 
|40||8
 
|-
 
|50||7
 
|-
 
|60||6
 
|-
 
|70||5
 
|-
 
|80||4
 
|-
 
|90||3
 
|}
 
 
 
== Paving ==
 
 
 
The surface of a bridge can be [[Paving|paved]] (Excluding [[Rope bridge|rope bridges]] and [[Wood bridge|wooden bridges]]).
 
 
 
As with reinforced cave floors, this is accomplished first by activating [[mortar]] and using it to '''Prepare''' the surface of the bridge, then using the appropriate pavement material to pave the prepared tile.
 
 
 
[[Pavement]] can be removed from [[bridges]] at any time using a [[crowbar]]
 
 
 
== Gallery ==
 
 
 
{{spoiler|<br>
 
<gallery heights=200px mode="packed-hover">
 
File:Rope_bridge.jpg|link=Rope bridge|Rope bridge
 
File:Wood_bridge.jpg|link=Wood bridge|Wood bridge
 
</gallery>
 
<gallery heights=200px mode="packed-hover">
 
File:Stone_bridge.jpg|link=Brick bridge|Brick bridge
 
File:Rounded_stone_bridge.jpg|link=Rounded stone bridge|Rounded stone bridge
 
</gallery>
 
<gallery heights=200px mode="packed-hover">
 
File:Rendered_bridge.jpg|link=Rendered bridge|Rendered bridge
 
File:Sandstone_bridge.jpg|link=Sandstone bridge|Sandstone bridge
 
</gallery>
 
<gallery heights=200px mode="packed-hover">
 
File:Slate_bridge.jpg|link=Slate bridge|Slate bridge
 
File:Marble_bridge.jpg|link=Marble bridge|Marble bridge
 
</gallery>
 
<gallery heights=200px mode="packed-hover">
 
File:Pottery_bridge.jpg|link=Pottery bridge|Pottery bridge
 
</gallery>
 
}}
 
 
 
== Notes ==
 
* Bridges and their components cannot be dyed.
 
* The first level of a house is calculated at 33 dirt. Each additional level adds 30 dirt.
 
* Brick/Marble/Wood/Slate/Sandstone bridges require solid walls directly below, for at least two stories of the building. Example: 3-story house can have a door on the first floor, but must have solid walls for the next two floors on the side with a connecting bridge.
 
* Any bridges connected directly to a structure will disappear upon the structure being destroyed.
 
* Bridges will only begin to decay after a week of no use.
 
* Modifying the terrain after planning a bridge will require re-planning the bridge.
 
* You can dig under bridges, with the exception of at the ends or next to supports.
 
* On neighboring tiles, bridges and buildings do not generally cause a conflict with one another. This is regardless of the order in which each is built.
 
* Bridges cannot be built over any tile that has a [[settlement token]] or any opening into a mine. These obstacles must be located 2 tiles away from any bridge component, at least, in order for successful bridge planning to take place. See image on [[rope bridge]] page for visual example (here the mine entrance is located just outside of the interference range).
 
* '''Building Tip:''' Building 2 or more tile wide bridges can be difficult to plan. As the diagram shows below you must offset your two characters (the A and the B in the diagram) by how many tiles wide you want the bridge to be and make the two characters face each other.
 
 
 
  +-----+-----+
 
  |A    |    |
 
  |    |    |
 
  |    |    |
 
  +-----+-----+
 
  |    |    |
 
  |    |    |
 
  |    |    |
 
  +-----+-----+
 
  |    |    |
 
  |    |    |
 
  |    |    B|
 
  +-----+-----+
 
 
 
== Links ==
 
* Some Bridge info may be found in the week 43 news post here:  http://forum.wurmonline.com/index.php?/topic/112518-news-update-work-and-progress-week-43/
 
* Bridge material calculator located here:  http://forum.wurmonline.com/index.php?/topic/122044-bridge-material-calc/
 
 
 
== Bridge Types, Required Planning Tools ==
 
* [[Dioptra]]
 
* [[Range pole]]
 
* [[Rope bridge]]
 
* [[Wood bridge]]
 
* [[Brick bridge]]
 
* [[Marble bridge]]
 
 
 
 
 
[[Category:Bridges]]
 
[[Category:Babel/B]]
 

Latest revision as of 02:23, 4 October 2019

Redirect to: