Difference between revisions of "Cliff"
Jump to navigation
Jump to search
m (babelfix) |
|||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | [[CDB|Main]] / [[:Category:Terrain|Terrain]] / '''{{PAGENAME}}''' | + | {{terrain |
+ | |name=Cliff | ||
+ | |speed=8.20km/h | ||
+ | |type=Natural | ||
+ | |playermade=No | ||
+ | |underground=No | ||
+ | |creation=not possible | ||
+ | |material=stone shards | ||
+ | |method=mine | ||
+ | }}[[CDB|Main]] / [[:Category:Terrain|Terrain]] / '''{{PAGENAME}}''' | ||
===Description=== | ===Description=== | ||
− | A cliff tile is a steeper version of a regular [[rock]] | + | A cliff tile is a steeper version of a regular [[rock tile]], and can be mined and prospected in the same fashion. Unlike rock tiles cliffs cannot be revealed if they are covered in dirt, even if you dig down to it at all four corners. |
− | + | ==Notes== | |
+ | * Corner of cliff cannot be rised by [[concrete]] | ||
+ | * Cliff tile can be switch into regular [[rock tile]] by: | ||
+ | ** [[surface mining]] northwest corner | ||
+ | ** first [[erupt]] then freeze (northwest corner of lava tile will rise by 4 slope after erupt), | ||
+ | ** first tunnel excavation then cast [[strongwall]] (be carefull - top and bottom borders of mine entrance will be flat) | ||
+ | |||
+ | ===See also=== | ||
+ | [[Mining]] and [[Prospecting]] | ||
[[Category:Terrain]] | [[Category:Terrain]] | ||
[[Category:Babel/C]] | [[Category:Babel/C]] |
Latest revision as of 20:45, 22 February 2023
Properties |
---|
|
Creation |
|
Material |
|
Description
A cliff tile is a steeper version of a regular rock tile, and can be mined and prospected in the same fashion. Unlike rock tiles cliffs cannot be revealed if they are covered in dirt, even if you dig down to it at all four corners.
Notes
- Corner of cliff cannot be rised by concrete
- Cliff tile can be switch into regular rock tile by:
- surface mining northwest corner
- first erupt then freeze (northwest corner of lava tile will rise by 4 slope after erupt),
- first tunnel excavation then cast strongwall (be carefull - top and bottom borders of mine entrance will be flat)
See also
Mining and Prospecting