Difference between revisions of "Wood bridge - abutment"
Jump to navigation
Jump to search
m (added a header, fixed the description format) |
m (Seedlings moved page Wood Bridge - Abutment to Wood bridge - abutment: casing) |
Revision as of 19:20, 2 March 2017
Main Stage |
---|
Roadway Stage |
|
Wall Stage (each wall) |
|
Result |
|
Skill and improvement |
|
Description
You see plans for a Wood abutment. The Wood abutment requires 4 large nails, 2 small nails, 8 wooden beams, 4 shafts, 24 planks and 4 iron ribbons to be finished.
Total materials
- 2 small nails
- 4 large nails
- 4 iron ribbons
- 4 shafts
- 8 wooden beams
- 24 planks