Difference between revisions of "Lore:Cave Canal"

From Wurmpedia
Jump to navigation Jump to search
(Started the article. More will come when I cna think fo what to do.)
 
Line 1: Line 1:
 
The ''Cave Canal'', connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid july and ending in late August, 673 tiles needed to be mined out, as well as surface rock sculpted, entry houses made, walls reinforced, mineral veins removed and the canal made deeper and with a higher roof.
 
The ''Cave Canal'', connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid july and ending in late August, 673 tiles needed to be mined out, as well as surface rock sculpted, entry houses made, walls reinforced, mineral veins removed and the canal made deeper and with a higher roof.
 +
 +
===Contributors===
 +
In no particular order:
 +
Mystecore, ILerndGramrGud, Cameron, Wordsworth, Horothewise, Andreea, Llurendt, Robfox, Candymountai, Dreww, Artashes, Yazl, Ripsipiiraka, Pentaxpilot, Caesar, Tritus, Aureate, Gaffeek, Silentnight, Ulfpain, Tukster, Mithika, Ols, Nsu, Tigar, Aloof, Rabid
 +
 +
''Some may have been missed out, contact Ols if you feel cheated.''
 +
 +
===Completion Dates===
 +
*Stage one (All tiles mined out.): 14/07/09 - 5/08/09 (Mineral veins taken down on 29/08/09)
 +
*Stage two (Deepen the canal and raise the roof.): 22/07/09 - 29/08/09
 +
*Stage three (Support Beams on the sides.): 30/07/09 - Ongoing
 +
*Stage four (Docks and external features.): In planning phase - Ongoing

Revision as of 12:04, 5 September 2009

The Cave Canal, connecting two lakes and permitting travel through the central lakes was a project commisioned by Flyingmonkey, and features a 3 tile boatway and a 1 tile walkway cut through rock. Beginning in mid july and ending in late August, 673 tiles needed to be mined out, as well as surface rock sculpted, entry houses made, walls reinforced, mineral veins removed and the canal made deeper and with a higher roof.

Contributors

In no particular order: Mystecore, ILerndGramrGud, Cameron, Wordsworth, Horothewise, Andreea, Llurendt, Robfox, Candymountai, Dreww, Artashes, Yazl, Ripsipiiraka, Pentaxpilot, Caesar, Tritus, Aureate, Gaffeek, Silentnight, Ulfpain, Tukster, Mithika, Ols, Nsu, Tigar, Aloof, Rabid

Some may have been missed out, contact Ols if you feel cheated.

Completion Dates

  • Stage one (All tiles mined out.): 14/07/09 - 5/08/09 (Mineral veins taken down on 29/08/09)
  • Stage two (Deepen the canal and raise the roof.): 22/07/09 - 29/08/09
  • Stage three (Support Beams on the sides.): 30/07/09 - Ongoing
  • Stage four (Docks and external features.): In planning phase - Ongoing