Difference between revisions of "Stone Fence"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
!Skill !! Maximum Slope !!Skill !!Maximum Slope !!Skill !!Maximum Slope | !Skill !! Maximum Slope !!Skill !!Maximum Slope !!Skill !!Maximum Slope | ||
|- | |- | ||
− | |6 || 17 | + | |6 || 17|| 25 || 25 || 59 || 33 |
|- | |- | ||
− | |8 || 18 | + | |8 || 18|| 29 || 26 || 64 || 34 |
|- | |- | ||
− | |9 || 19 | + | |9 || 19|| 33 || 27 || 70 || 35 |
|- | |- | ||
− | |12 || 20 | + | |12 || 20|| 36 || 28 || 76 || 36 |
|- | |- | ||
− | |14 || 21 | + | |14 || 21|| 41 || 29 || 81 || 37 |
|- | |- | ||
− | |16 || 22 | + | |16 || 22|| 45 || 30 || 88 || 38 |
|- | |- | ||
− | |19 || 23 | + | |19 || 23|| 49 || 31 || 94 || 39 |
|- | |- | ||
− | |22 || 24 | + | |22 || 24|| 54 || 32 || || |
|} | |} | ||
Revision as of 03:20, 10 August 2013
Main / Skills / Masonry / Stone Fence
Creation |
---|
|
Additional materials |
|
Result |
|
Skill and improvement |
|
Notes |
|
Description
You see a stone fence.
Taller than a Low stone wall and about the same height as an Iron fence. Blocks movement.
Repair
Stone fences can be improved or repaired with stone brick.
Skill Required
To start planning minimum of 5 Masonry skill required, even for totally flat tiles. *as of 12/22/12 (or some time before)
To calculate the maximum slope you can build on, based on your masonry skill, use the following formula (submitted by ketza):
Max slope = (3 * √skill) + 10
Note: The solution is rounded down.
Skill | Maximum Slope | Skill | Maximum Slope | Skill | Maximum Slope |
---|---|---|---|---|---|
6 | 17 | 25 | 25 | 59 | 33 |
8 | 18 | 29 | 26 | 64 | 34 |
9 | 19 | 33 | 27 | 70 | 35 |
12 | 20 | 36 | 28 | 76 | 36 |
14 | 21 | 41 | 29 | 81 | 37 |
16 | 22 | 45 | 30 | 88 | 38 |
19 | 23 | 49 | 31 | 94 | 39 |
22 | 24 | 54 | 32 |