(0/5 isnt a math error)
(Adding flattening guide by Tich on new flattening)
Line 14: Line 14:
  
  
'''Flattening has been revamped. The information below is mostly outdated and no longer correct'''
 
 
==Flattening Guide==
 
==Flattening Guide==
To make a patch of ground perfectly flat is an art, and requires patience. Below is a guide on how to flatten one tile.
 
<br><br>
 
When flattening you should not use the "flatten" option, this is only used to check if the tile is flat.
 
<br><br>
 
If when flattening a tile it takes 9 seconds, then the tile is completely flat, if it is anything else then you should stop the action straight away so you do not ruin tiles around the one you are trying to flatten.
 
<br><br>
 
You should always dig down the tile until it looks flat, you need to check the tile from all angles (North, East, South, West) this will ensure that you have no slopes on the tile. You can check for slopes by looking at the tile outline, the outline should be completely flat when you are looking directly at a compass position (N, NE, E, SE, S, SW, W, NW); this is a well known technique of getting a tile completely flat.
 
<br><br>
 
If you are having trouble flattening a tile, then flatten 1 tile using the "flatten" option, then dig down or drop dirt on tiles to match the outline of that tile.
 
<br><br>
 
Flattening Guide by: --[[User:Listylister|Listylister]] 16:09, 13 June 2006 (CDT)
 
  
EXTRA TIP!<br>
+
The times given when you start to flatten correspond to the number of dirt 'difference' these are :
You can use the flattening action, if the corners (maximum 2) that need to be corrected are ''above'' flat level and it takes no more than 14 seconds.<br>
 
If only one corner is 2 steps from being flat, you can use the flattening action here too (19 seconds). --[[User:Helge|Helge]] 16:46, 13 June 2006 (CDT)
 
----
 
  
===Flattening timers===
+
0 = "The ground is flat now."
 +
1..3 = 9 secs
 +
4..7 = 19 secs
 +
8..11 = 29 secs
 +
12..15 = 39 secs
 +
16..19 = 49 secs
 +
etc
  
To see how many digs you have left on one corner(only if the other 3 corners of the tile are at the same level) subtract 9 from the total time, then divide it by 5.
+
so the time is the "number of dirt difference" / 4, rounded down, * 10 + 9.
  
For example if the timer reads 29:
+
The 'number of dirt difference' is the difference between the highest and lowest points.
  
29 - 9 = 20, 20/5 = 4
+
so a 9 secs timer could be from tiles like this...
 +
 
 +
<pre>
 +
0---1 or 0---3 or 0---0
 +
|  |    |  |    |  |
 +
1---2    3---3    0---3
 +
</pre>
 +
 
 +
 
 +
 
 +
If At the end of the timer, the tile is in the 1-3 dirt difference range, and the following happens :
 +
 
 +
1 = "You assemble some dirt from a corner." (and you get one dirt added to inventory).
 +
2 = "You assemble some dirt from a corner." (and you get one dirt added to inventory).
 +
3 = If you are carrying at least one dirt you get "You use some of the dirt in one corner." or if you are not carrying any dirt then you get "If you carried some dirt, it would be used to fill the 1 corners that need it."
 +
 
 +
Note that after flattening, its a good idea to flatten again if you got the "assemble" message, as there may have been 2 dirt extra. Also if you did not have a dirt on you to use, you may want o dig one (from another tile) and reflatten so it can use it.
 +
 
 +
Main problem with flattening a large area, is that is it hard to tell how many dirt a certain tile needs. I'll try to explain...
 +
 
 +
3 tiles in a row.
 +
 
 +
<pre>
 +
0---1---1---2
 +
| A | B | C |
 +
0---0---3---1
 +
</pre>
 +
 
 +
 
 +
Flatten tile A and C and end up with...
 +
 
 +
<pre>
 +
0---0---2---2
 +
| A | B | C |
 +
0---0---2---2
 +
</pre>
 +
 
 +
 
 +
Note after flattening tile A, you would get a dirt in inventory, and flattening tile C will use that dirt.
 +
 
 +
Now, when you test tile B (flatten, and then stop, making note of the timer), you will see that its timer was 9 seconds, but will not know if its like ...
 +
 
 +
<pre>
 +
0---0---1---1 or 0---0---2---2 or 0---0---3---3
 +
| A | B | C |    | A | B | C |    | A | B | C |
 +
0---0---1---1    0---0---2---2    0---0---3---3
 +
</pre>
 +
 
 +
 
 +
So you will need to add dirt (in multiples of 4 (one to each corner maybe easiest)) to tile A (or remove dirt in mutiples of 4 from C (one from each corner maybe easiest)) and check again,
 +
 
 +
Repeat until you get the "The ground is flat now." message.
  
You'll have 4 digs left
 
  
 
===Small digging guide===
 
===Small digging guide===

Revision as of 05:50, 4 October 2006

Main / Skills / Digging

Description

Digging requires a Shovel. Activate shovel ---> Right-click a tile (any but rock) and select Dig. This will lower the ground and put 1x of the tile compound in your inventory. The ground is lowered at the closest corner to where you are standing, rather than where you click.

So if you want to lower a tile stand in the corner of the tile activate your shovel, right click>Dig this will lower the corner you are standing on. To lower the whole tile, you must stand in each of the four corners in turn and dig. This is the same for raising a tile, just drop dirt instead of dig.

When you think you have a tile nearly flat you can find out if it is perfectly flat by right clicking>flatten. You will then get the message 'The ground is flat here' in the event window.

A better way to check the flatness of an edge of the tile is to press 'c' key, then look at one tile and if the line is straight, then you are sure it is flat.

Digging for rock

If you want to dig for a rock tile you must be aware that you probably have to dig a lot of dirt. To start you must dig a reasonable distance above water, keep digging in one corner till you "hit rock" or you do not have enough skill to dig deeper. Once you hit rock in one corner you must then dig until you hit rock in the other corners of the tile. When you hit rock in all four corners the rock tile will be uncovered.


Flattening Guide

The times given when you start to flatten correspond to the number of dirt 'difference' these are :

0 = "The ground is flat now." 1..3 = 9 secs 4..7 = 19 secs 8..11 = 29 secs 12..15 = 39 secs 16..19 = 49 secs etc

so the time is the "number of dirt difference" / 4, rounded down, * 10 + 9.

The 'number of dirt difference' is the difference between the highest and lowest points.

so a 9 secs timer could be from tiles like this...

0---1 or 0---3 or 0---0
|   |    |   |    |   |
1---2    3---3    0---3


If At the end of the timer, the tile is in the 1-3 dirt difference range, and the following happens :

1 = "You assemble some dirt from a corner." (and you get one dirt added to inventory). 2 = "You assemble some dirt from a corner." (and you get one dirt added to inventory). 3 = If you are carrying at least one dirt you get "You use some of the dirt in one corner." or if you are not carrying any dirt then you get "If you carried some dirt, it would be used to fill the 1 corners that need it."

Note that after flattening, its a good idea to flatten again if you got the "assemble" message, as there may have been 2 dirt extra. Also if you did not have a dirt on you to use, you may want o dig one (from another tile) and reflatten so it can use it.

Main problem with flattening a large area, is that is it hard to tell how many dirt a certain tile needs. I'll try to explain...

3 tiles in a row.

0---1---1---2
| A | B | C |
0---0---3---1


Flatten tile A and C and end up with...

0---0---2---2
| A | B | C |
0---0---2---2


Note after flattening tile A, you would get a dirt in inventory, and flattening tile C will use that dirt.

Now, when you test tile B (flatten, and then stop, making note of the timer), you will see that its timer was 9 seconds, but will not know if its like ...

0---0---1---1 or 0---0---2---2 or 0---0---3---3
| A | B | C |    | A | B | C |    | A | B | C |
0---0---1---1    0---0---2---2    0---0---3---3


So you will need to add dirt (in multiples of 4 (one to each corner maybe easiest)) to tile A (or remove dirt in mutiples of 4 from C (one from each corner maybe easiest)) and check again,

Repeat until you get the "The ground is flat now." message.


Small digging guide

For those that had trouble with any of the above guides, here is a small picture that may clarify it.
This is the result of dropping a small amount of dirt on the corner of a tile. n00bdiggingguideoe0.png


Information icon.png
Cleanup-icon.gifTo meet Wurmpedia's quality standards, this article or section requires a cleanup by the Wurmpedia Team.