Difference between revisions of "Slate slab opening"

From Wurmpedia
Jump to navigation Jump to search
m (same as below)
Line 8: Line 8:
 
|passive=[[floor plan]]
 
|passive=[[floor plan]]
 
|group=Slate slab opening
 
|group=Slate slab opening
|materials=
+
|materials=*?x [[Concrete]]
 +
*?x [[Slate shingle]]
 
|result=* 1 '''{{PAGENAME}}'''
 
|result=* 1 '''{{PAGENAME}}'''
 
|skill=paving}}
 
|skill=paving}}

Revision as of 16:40, 29 September 2013

Main / Skills / Masonry / Slate slab opening


StubIcon.png This article is a stub. You can help by adding to it.

Information icon.png Stubs are articles that writers have begun work on, but are not yet complete enough to be considered finished articles.


Slate slab opening
A Slate slab opening
Creation
  1. Activate
  2. Right-click floor plan
  3. Open submenu "Create > Slate slab opening"
Additional materials
Result
  • 1 Slate slab opening
Skill and improvement



Description

Floor plan to create an opening with a ladder for multi-story buildings.

Usage

  • Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
  • Right click the floor plan, select Build > Slate slab opening

Notes

  • Premium paving skill is required to start a stone slab opening. 21 is assumed, possibly higher.
  • TBC

Total materials needed

  • TBC