Difference between revisions of "Slate slab opening"
Jump to navigation
Jump to search
(changes to materials needed) |
|||
| Line 1: | Line 1: | ||
| − | [[CDB|Main]] / [[Skills]] / [[ | + | [[CDB|Main]] / [[Skills]] / [[Paving]] / '''{{PAGENAME}}''' |
{{stub}} | {{stub}} | ||
Revision as of 02:17, 3 November 2013
Main / Skills / Paving / Slate slab opening
| This article is a stub. You can help by adding to it.
|
| Creation |
|---|
|
| Additional materials |
|
| Result |
|
| Skill and improvement |
|
Description
Floor plan to create an opening with a ladder for multi-story buildings.
Usage
- Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
- Right click the floor plan, select Build > Slate slab opening
Notes
- Premium paving skill is required to start a stone slab opening. 21 is assumed, possibly higher.
- TBC
Total materials needed
- 2x slate slab
- 21x slate shingle
- 5x concrete (1.5kg lye, 1.5kg mortar)
- 10x mortar