Difference between revisions of "Slate slab opening"
Jump to navigation
Jump to search
m |
m |
||
Line 22: | Line 22: | ||
==Notes== | ==Notes== | ||
* Requires 30 paving skill to start | * Requires 30 paving skill to start | ||
− | |||
==Total materials needed== | ==Total materials needed== |
Revision as of 18:56, 24 February 2014
Main / Skills / Paving / Slate slab opening
This article is a stub. You can help by adding to it.
Stubs are articles that writers have begun work on, but are not yet complete enough to be considered finished articles. |
Creation |
---|
|
Additional materials |
|
Result |
|
Skill and improvement |
|
Description
Floor plan to create an opening with a ladder for multi-story buildings.
Usage
- Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
- Right click the floor plan, select Build > Slate slab opening
Notes
- Requires 30 paving skill to start
Total materials needed
- 2x slate slab
- 40 slate shingle
- 8 concrete (1.5kg lye, 1.5kg mortar)
- 10x mortar