House (general)
Contents
Description
A house is a structure meant for living, storage, as a gateway, or simply for decoration. In Wurm, these can be built of wood, timber and clay, or various types of bricks. Houses must be built on flattened ground.
Planning a House
Note: In the Wurmpedia, we will use "ground/first floor" to refer to the floor of the house that touches the ground.
In order to create a house, you will first need a mallet to create a plan. Activate your mallet and right-click the flat tile you want to start the building on. Select Plan Building. You can plan further tiles of the same house the in the same manner as long as they are adjacent to the initial house tile. Once you have completed your housing plan, right-click on the plans of the building and select Finalize Build Plan. You may still edit the plan of the building after you have finalized by right-clicking the tile you want to build on and selecting Add to building plan. This can be done even after all of the house is complete by destroying a single wall and expanding the building through Add to building plan.
If you made a mistake, you can delete a part of the plan by right-clicking the tile of the plan you want to remove and select Remove Plan Here If you want to delete the entire plan, right-click the structure and select Structure > Destroy structure. You will be given a confirmation window to make sure this is what you want to do.
Once you have finalized the build plan, you are required to complete the ground/first floor before you will be allowed to build another floor.
Creation
Building a house is based on the carpentry skill for wood and timber houses and a mixture of both carpentry and masonry for stone/brick houses. The minimum requirement of carpentry skill required to build a one tile house is 0. If your house is to be made out of stone, 30 masonry skill is required.
To create, right-click one of the wall sections and select 'Add to Crafting Window'. There are various wall plans and they require masonry & carpentry skill and a trowel for stone options; mallet and carpentry only for wood and timber framed options. Place the tool in the crafting window to see the options available to you. To start the creation process, you will also need to have the items required in your inventory: planks for wooden houses, wooden beams for timber houses, bricks and mortar for stone houses.
Once you have finished all of the wall plans for the ground/first floor, the house is considered complete, and you can move on to create more houses.
Naming
When the plan is finished the building will be given a default name that consists of the creator's name and a designation depending on the size of the house. The name can be changed through permissions management.
Designations used, based on number of tiles:
- shed - 1 - 2
- shack - 3
- cottage - 4 - 5
- house - 6
- villa - 7 - 10
- mansion - 11 - 20
- estate - 21 - 30
- stronghold - 31 - 65
House Plan Examples
Numbers listed above each plan is the minimum carpentry skill required for the ground/first floor of a wooden or timber house. You can also check HouseCalc for the carpentry skill and materials required for your custom plan without download. At this time, this tool does not incorporate timber-framed materials and as an outside resource, use at your own risk.
1-4 tiles
0 3 6 7 9 X XX XX XXX XX XXXX XXX XXX X XX X X
5 tiles
10 12 XXX XXXXX XXXX XXXX XXX XXX X X X X XX X X X X X XXX XXX XXX XX X X X X XX
6 tiles
11 13 XXX XXXX XXXX XXX XXX XXX XXX XX XX XXX XX XX X X 15 XXXXXX XXXXX XXXXX XXXXX XXXX XXXX XXXX XXX X X X X X X X XX XX X XXXX XXXX X X X X XXX X X XXXX XXXX XXXX XXXX XXX X X X X X X XX
Larger examples
16 27 40 55 72 91 XXX XXXX XXXXX XXXXXX XXXXXXX XXXXXXXX XXX XXXX XXXXX XXXXXX XXXXXXX XXXXXXXX XXX XXXX XXXXX XXXXXX XXXXXXX XXXXXXXX XXXX XXXXX XXXXXX XXXXXXX XXXXXXXX XXXXX XXXXXX XXXXXXX XXXXXXXX XXXXXX XXXXXXX XXXXXXXX XXXXXXX XXXXXXXX XXXXXXXX
The formula to calculate the carpentry skill needed to build a house is the number of tiles + the number of outer walls - 5. For example: a 4 by 4 wall has 16 tiles and 16 outer walls so it would take 27 carpentry on the ground/first floor. For multi-story houses the formula is the same but there's an additional requirement based on the number of floors.
Adding a roof
- Plan and completely build the walls before adding a roof.
- Roofs are planned by activating a mallet and right-clicking the tiles on the ground beneath you. Each tile needs to be planned.
Adding a floor
- Plan and completely build the walls before adding a floor.
- Floors are planned by activating a mallet and right-clicking the tiles on the ground beneath you. Each tile needs to be planned.
Multi-Story Housing
Buildings can be constructed with multiple stories, but each one requires higher skill to build.
Skill needed
The more floors your house has, the more skill is needed; see the table below for the required skill levels. Only the first (ground) floor planning needs 1 carpentry skill per wall and 1 skill per tile minus 5. With 5 skill a roof may be placed over the first floor, but not an opening or floor above. The roof counts as the same story you are currently building and does not require any extra skill to roof. For example, a roof added to a 8 story building would still only require 70 skill.
|
|
|
How to make another floor
- Plan and completely build the first floor outer walls.
- Activate a mallet on a tile below and plan floor above
- Plan at least one tile with an opening above to make a ladder for a spot to climb up to upper floors or plan your staircase.
- Build the floors from below.
- Activate a mallet, right click tile borders to plan walls.
Notes
- You may have a total of 16 floors.
- Carpentry is the primary skill checked for planning each floor and building floors, openings, staircases, walls, and fences out of wood.
- Paving is required for stone floors, openings, and staircases.
- Masonry is required for stone walls, fences, parapets, as well as pottery and slate roofs. It is limited in multi-story houses based on Carpentry skill.
- Thatching is required for thatch roofs.
- Some materials might have higher skill requirements than the numbers mentioned below, in which case the highest requirement applies
- You can not build floors above fences, walls or parapets.
- You can drag carts up ladders to get them to an upper floor.
- You can fall and take damage from upper floors if there is no wall/fence of roof to stop you. (Please be careful as people have died in 1 fall from 4th floor drops)
- Ladders will always be on the south side of the opening.
- The ground/first floor must be complete before walls on the 2nd can be planned. This is not true, however, of any additional floors.
- Where a mallet is mentioned, a hammer can be used in its place.
- When you destroy a structure, all items on upper levels will fall to the ground.
Permissions & Safety
A house preserves your possessions by reducing decay on all servers, and protects them from theft on PVE servers. If the doors are equipped with a door lock, no one may enter your house except the friends you give permissions to, unless the door is lockpicked (Lockpicking only applies to PvP servers). Freedom servers do not allow lockpicking of houses.
- On the Freedom server, a locked house is the single best protection against theft. Whether on deed or off, houses there cannot be bashed down or lockpicked, though anyone can enter if you do not put door locks on all doors. Since a house's locks cannot be picked on Freedom, the door lock's quality isn't really very important there.
Beds, which are useful for gaining sleep bonus, only work when inside a house.
If the owner of a house has not logged in for 3 months, the house is marked as abandoned, and takes much higher decay damage.
Permissions Management
When the house is fully planned, the planner will see it under the Building Management window. The house can be managed by right-clicking on the house and selecting Permissions > Manage Building. In the management window you can modify various settings for the house. These settings will not take effect until all of the first floor walls are complete. The May Enter permission will not work until the doors are locked.
You can change the name of the house or transfer ownership from the Building Permission window.
Warning Messages while Building or Planning
- The ground is not flat enough.
- The highest slope of where you are trying to plan your building exceeds 0. Since multistory buildings have been added houses can only be planned on absolute flat surfaces.
- Your structure must connect everywhere.
- You tried to plan a tile that is not connected to the rest of your plan.
- You need space to build the walls. Another building is too close.
- You tried to plan a building within one tile of another building.
- There is already a building there.
- You tried to extend the plan of your building within one tile of another building.
- Only the owner of <House name> can remodel it.
- You tried to add an inner wall to a house that is not owned by you.
- You are not skilled enough in carpentry to extend your house in that direction.
- You tried to make your house bigger than your carpentry level allows.
- You must finish the outer walls first.
- You tried to plan an inner wall without having finished the outer walls.
- <Deed name> does not allow that.
- You tried to plan your building in the perimeter of a foreign settlement.
- This action is not allowed here, because the tile is on a player owned deed that has disallowed it.
- You tried to plan your building on a foreign settlement that disallows you from building on it.
- Houses need at least one door. Build a door first.
- You tried to continue the second to last wall without having a door planned.
- You are not allowed to expand <Player's name> planned structure.
- You tried to add to a building plan before finishing the plan.
- You can't build on water.
- Occurs when trying to plan a house on a tile that is 1 or more dirts below the water table.
- The water is too deep.
- Occurs when trying to build a fence on a tile that is 1 or more dirts below the water table.
- You cannot build here, there must be a gap around the building.
- Occurs when trying to plan a house in a cave that does not have a buffer around it when the cave is against the deed border. Also can occur when trying to plan a house in a cave when the house is off deed.
- You need to build in connection with a finished neighboring floor, roof or wall.
- Occurs when trying to plan a roof or floor that is not adjacent to an already finished floor/roof/or lower wall. Finish the adjacent tiles first before you can plan this tile.
- The ceiling is too close.
- Occurs underground when trying to add a tile to a building plan when the cave ceiling above would be too low for a single storey building. Mine the cave ceiling a little first, before planning this tile.
External Tools
External tools are not part of the Wurmpedia and not guaranteed to be accurate or approved by Wurm staff.
- Web-based Calculator by Toni
- Windows / Java Web Applet Calculator by Warlander which supports doughnut and multi-floor houses
See Also
For additional housing creation inspiration