Changes

Jump to navigation Jump to search

Warning messages

7 bytes added, 15:17, 27 July 2019
m
Fixed link to Cave Dwellings
*''You cannot build here, there must be a gap around the building.''
:Occurs when trying to plan a house in a cave that does not have a buffer around it when the cave is against the deed border. Also can occur when trying to plan a house in a cave when the house is off deed.
::'''See more:''' [[Build HouseGuides:Build_house#Cave DwellingsCave_dwellings|Cave Dwellings]]
*''You need to build in connection with a finished neighboring floor, roof or wall.''
:Occurs when trying to plan a roof or floor that is not adjacent to an already finished floor/roof/or lower wall. Finish the adjacent tiles first before you can plan this tile.
editor
82

edits

Navigation menu