*Stage one (All tiles mined out.): 14/07/09 - 5/08/09 (Mineral veins taken down on 29/08/09)
*Stage two (Deepen the canal and raise the roof.): 22/07/09 - 29/08/09
*Stage three (Support Beams on the sides.): 30/07/09 - Ongoing28/10/09
*Stage four (Docks and external features.): In planning phase - Ongoing