Difference between revisions of "Charcoal Pile"
Jump to navigation
Jump to search
(cc piles produce ash) |
|||
Line 2: | Line 2: | ||
== Description == | == Description == | ||
− | A large kiln-like [[:Category:Structures|Structure]] made from log and covered in dirt. The purpose is to turn the [[log | logs]] into [[ | + | A large kiln-like [[:Category:Structures|Structure]] made from log and covered in dirt. The purpose is to turn the [[log | logs]] into [[tar]], [[ash]] and [[charcoal]]. |
== Method == | == Method == | ||
Line 25: | Line 25: | ||
== Skill Used == | == Skill Used == | ||
− | Coal- | + | [[Coal-Making]] |
− | |||
[[Category:Structures]] | [[Category:Structures]] | ||
[[Category:Containers]] | [[Category:Containers]] | ||
[[Category:Babel/C]] | [[Category:Babel/C]] |
Revision as of 12:07, 22 October 2006
Main / Items / Charcoal Pile
Contents
Description
A large kiln-like Structure made from log and covered in dirt. The purpose is to turn the logs into tar, ash and charcoal.
Method
- Activate a Kindling and right-click on a 25.0kg Log, select Create/Containers/Pile.
- Activate a Log and right-click on the Unfinished Charcoal Pile, select Continue. Repeat 19x
- Activate a Pile of dirt and right-click on the Unfinished Charcoal Pile, select Continue. Repeat.
Tools Required
Items Required
- 1xKindling - 1.5kg
- 21xLog - 18.0kg (The first log must be 25.0kg)
- 2xPile of dirt - 20.0kg
Resulting Product
- Unfinished Charcoal Pile
- Charcoal Pile
Usage
After finished, light the pile. The Pile will slowly damage and create Charcoal and Tar. It can take days to finish.